top of page


Informasi Proyek
A. Coal Mining
PT Adaro Energy Tbk (Tanjung, Kalimantan Selatan)
300.000 m3 + 500.000 m3 of slurry pond (2014 – 2015)
​
-
Pilot Trial project for slurry pond – PT Adaro Energy Tbk (2014)*
-
Main Project for slurry pond – PT Adaro Energy Tbk (2015)*
B. Mineral Processing

1/1
PT Citra Palu Mineral (Palu, Sulawesi Tengah)
d-sludge tube dewatering system (2020)

1/1
PT Sumbawa Timur Mining (NTB)
d-sludge tube T and d-sludge bag (2022)
​
Merdeka Copper & Gold Group
Trial d-sludge tube dewatering system (2022)
Mud drying acceleration using d-sludge vds project (2023)

1/1
* Material supply by Geosinindo Group and Installation by Third Party
bottom of page