top of page
Rev 4.png

Informasi Proyek

A. Coal Mining

PT Adaro Energy Tbk (Tanjung, Kalimantan Selatan)

300.000 m3 + 500.000 m3 of slurry pond (2014 – 2015)

​

  1. Pilot Trial project for slurry pond – PT Adaro Energy Tbk (2014)*

  2. Main Project for slurry pond – PT Adaro Energy Tbk (2015)*

B. Mineral Processing

PT Citra Palu Mineral (Palu, Sulawesi Tengah)

d-sludge tube dewatering system (2020)

PT Sumbawa Timur Mining (NTB)

d-sludge tube T and d-sludge bag (2022)

​

Merdeka Copper & Gold Group

Trial d-sludge tube dewatering system (2022)

Mud drying acceleration using d-sludge vds project (2023)

* Material supply by Geosinindo Group and Installation by Third Party

geoteknika logo

A Versatile Dewatering Technology

Head Office :
Jl. Batik Kumeli No. 10A, Sukaluyu
Cibeunying kaler,
Bandung 40123 - Indonesia
+62 (22) 20457514
www.geoteknika.co.id

Representative Office :
Roxy Mas Business Center Blok C4 No. 17-20
Jl. KH Hasyim Ashari,
Jakarta Pusat 10150 - Indonesia
+62 (21) 6330150
office@geoteknika.co.id

Copyright © 2024 PT Geoteknika Adhiyasa. All Rights Reserved.

bottom of page